Irwell Riverside Housing Development
Salford, Manchester
Client: URBAN SPLASH
Main Contractor: Williams Construction
Surfacing Contractor: Tarmac Contracting
Location: Irwell Riverside, Manchester
Completion: October 2018
The Challenge
A distinctive, aesthetic surface was required for this modern housing development located on the River Irwell in Salford, to the north of Manchester. The development consisted of town houses with driveways and parking areas in a bold, contemporary, geometric design. The new surface would need to differentiate this housing development and attract potential home buyers. It would also need to be durable enough to resist frequent vehicle traffic and power-assisted turning and be maintenance-free.
Our Solution
The project involved a 6km green bus lane for the No. 67 bus service along the A5127 Lichfield Road and A38 Tyburn Road in Birmingham. ULTICOLOUR classic green was supplied and installed by our contracting team. 2,500 tonnes of 14mm green ULTICOLOUR providing effective demarcation of the three metre wide bus lanes along one of the busiesULTICOLOUR, Tarmac’s range of
coloured asphalts was chosen in a
buff quartzite colour. Using a high
performance clear binder, it offers far
brighter colours than conventional
asphalts. It is also highly durable,
delivering lasting performance, even
in highly trafficked environments.
ULTICOLOUR coloured asphalt is
available in a range of colours from
bright red and greens to more
neutral buff, natural and grey
colours. This gives architects the
freedom to choose a surface colour
that complements their design.
ULTICOLOUR is laid quickly over
large areas using conventional
paving machines. As a result work
was completed quickly.
t routes in the City Centre.
Results and Benefits
As planned, 115 tonnes of Buff
Quartzite was supplied to the site and
laid by the Tarmac Contracting North
West Surfacing team. Tarmac’s
dedicated Ulticolour paver was used on
this site, to ensure an excellent finish.
The paver is used purely for the
installation of buff and natural shades,
eliminating any risk of colour
contamination. Work was completed
within just one day, in line with the
allocated programme time. After
hearing about ULTICOLOUR’s
impressive performance on other sites,
the client was confident about the long
term durability on this development.
"This was the first time that we had
seen this type of surfacing and we were
extremely pleased with the results.
Tarmac carried out the work in an
extremely professional and first class
manner and the result looked amazing!"
Damian Williams, Director, Williams
Construction (Stockport) Limited