Heritage Road SurfaceHorse Guards ParadeHomeCase StudiesRingway GroupClient: Royal ParksMain Contractor: Ringway GroupLocation: Horse Guards ParadeDownload Case Study (PDF)The ChallengeA road leading up to the parade needed to be surfaced to accommodate the large amount of traffic that passes over it. The Parade is situated in front of the Grade II listed Horse Guards building, and the surrounding area includes St James’s Palace. The …